Reference material

The following reference materials are provided solely and specifically for use on the transport network owned or managed by the NSW Government and its agencies. They are not suitable for any other purpose. You must not use or adapt it or rely upon it in any way unless you are authorised in writing to do so by a relevant NSW Government agency.

If this document forms part of a contract with, or is a condition of approval by, a NSW Government agency, use of the document is subject to the terms of the contract or approval.

 

Asset Management

Title
Guide to Transport for NSW Framework for Assuring the Safety of Rail Assets and Infrastructure (pdf 1.4MB)

 

Civil

Title
Airport Line Tunnel Protection Guidelines - Guidelines for Development Within the Vicinity of the Airport Line (pdf 3.3MB)
ECRL Underground Infrastructure Protection Guidelines (pdf 24.1MB)

 

Electrical

Title
Proposed Operating Diagrams - FAQ (pdf 128KB)
The New Mark-3 OHW Tunnel Cantilever (pdf 15.5MB)

 

Signals and control systems

Title
Aspect Sequences with High Speed Turnouts (pdf 950KB)
CSEE UM71 Track Circuit Test and Investigation Guideline (pdf 1.0MB)
Control of Trains Approaching Catch Points, Buffer Stops and Short Overlaps (pdf 527KB)
Signalling Surge Protection Installation Guidelines (pdf 881KB)
LED Signals Controlled by Relay Circuits (pdf 290KB)
Signalling Supply Adjustment Guideline (pdf 527KB)
Aspect Controls and Indications in CBI Systems with Relay Interface (pdf 560KB)
Interface Agreement between Signal Engineering and Bridges & Structures Engineering (pdf 278KB)
Interface Agreement between Signal Engineering and Electrical Engineering (pdf 367KB)
Interface Agreement between Signal Engineering and Track Engineering (pdf 278KB)
Interface Agreement between Signals & Control Systems and Condition Monitoring Systems, C&CS (pdf 490KB)
Quick Release of Approach Locking (pdf 527KB)
Interface Agreement between Signals and Communications and Control System Division (pdf 671KB)

 

Track

Title
Design Guidelines for the Upgrade and Construction of New and Existing Train Stabling Yards and Turnback Sidings (pdf 4.7MB)